Home › Zendure SuperBase V4600 › Fibre ONT + Wi-Fi router
Can the Zendure SuperBase V4600 run a fibre ONT + Wi-Fi router?
The fibre ONT + Wi-Fi router uses about 18 W, well within the Zendure SuperBase V4600's 3,800 W rating.
The Zendure SuperBase V4600 in a real home
Tap another appliance to check it with the Zendure SuperBase V4600.
Your device is different? Type its watts
The numbers
| Zendure SuperBase V4600 battery | 4,608 Wh × 95% usable |
|---|---|
| Inverter | 3,800 W continuous, 5,000 W surge; ~90% efficient + ~25 W idle draw |
| Fibre ONT + Wi-Fi router | 18 W running |
| Runtime | 4,608 × 0.95 ÷ (18 ÷ 0.9 + 25) = 97.3 h |
Running it around the clock takes about 1.1 kWh a day from the battery. With 3,000 W of panels (the Zendure SuperBase V4600 maximum) an average June day gives about 10.8 kWh in Dublin and 14.6 kWh in Madrid – enough to keep up.
Recharge the Zendure SuperBase V4600 with solar
| City | 200 W panel | 3,000 W (max input) | ||
|---|---|---|---|---|
| Dec | Jun | Dec | Jun | |
| Dublin | 20.2 d | 6.4 d | 1.3 d | 0.4 d |
| London | 19.6 d | 6.1 d | 1.3 d | 0.4 d |
| Berlin | 25.3 d | 5.6 d | 1.7 d | 0.4 d |
| Paris | 16.4 d | 5.7 d | 1.1 d | 0.4 d |
| Madrid | 7.3 d | 4.7 d | 0.5 d | 0.3 d |
Days from empty to full, panels at the best fixed tilt, average day of the month. Solar data: PVGIS (EU JRC), fetched 2026-11-16. Laid flat or on a balcony rail, expect less: see solar recharge by city.
Other power stations with a fibre ONT + Wi-Fi router
| Model | Battery | Verdict | Result |
|---|---|---|---|
| EcoFlow DELTA 2 Max | 2,048 Wh | Runs | about 2.1 days |
| EcoFlow DELTA 3 Max | 2,048 Wh | Runs | about 2.1 days |
| Bluetti Elite 200 V2 | 2,074 Wh | Runs | about 2.2 days |
| Bluetti Apex 300 | 2,765 Wh | Runs | about 2.4 days |
| Jackery Explorer 3000 v2 | 3,072 Wh | Runs | about 2.7 days |
| Jackery Explorer 3600 Plus | 3,584 Wh | Runs | about 3.2 days |
| EcoFlow DELTA Pro 3 | 4,096 Wh | Runs | about 3.6 days |
| Zendure SuperBase V4600 | 4,608 Wh | Runs | about 4.1 days |
| EcoFlow DELTA Pro Ultra | 6,144 Wh | Runs | about 5.4 days |
All 31 power stations with a fibre ONT + Wi-Fi routerEverything the Zendure SuperBase V4600 can runSolar recharge by city
Source: official Zendure product page, checked 2026-11-15. Brands change specs between batches: confirm on the product page before you buy.
Note: EU page FAQ: V4600 LFP 4,608 Wh, 3,800 W rated, 5,000 W peak, 3,000 W solar (one MPPT, XT90), up to 4 Satellite Batteries per unit.